As part of the expansion, which includes the development of the port’s South Quay, Khalifa Port Logistics, and Abu Dhabi Terminals at a total investment of AED 4 billion, Khalifa Port has grown from 2.43 km2 to 8.63 km2, while its quay wall has been significantly extended from 2.3 kilometres to 12.5 kilometres. It now provides 21 berths and offers a range of bespoke services for key strategic industries, positioning it among the global elite of deep-water ports, with an estimated value of AED 20.4 billion.
The programme is set to make a major contribution to AD Port Group’s goal of increasing handling capacity at Khalifa Port by 2030 to 15 million TEUs per year, and general cargo handling capacity to 25 million tonnes.
Officially inaugurated by the late Sheikh Khalifa on 12.12.12, Khalifa Port was developed from a stretch of reclaimed land four kilometres out to sea and is now a major hub serving more than 25 container shipping lines with direct links to more than 70 international destinations. It has been ranked in the top five of the global Container Port Performance Index (CPPI), developed by the World Bank and S&P Global Market Intelligence, and now hosts three of the world’s top four shipping operators, CSP COSCO, MSC and CMA CGM.